Filter and download specific information by keyword.
Turnkey solution including planning, material production, installation and testing for a wind farm in the German North Sea - 51 km total length
Go to pageQaddy® is an integrated cable reel, pay-off and drum trolley, which significantly improves working conditions for electricians with its revolutionary ergonomic design.
Go to pageThe turnkey solution comprised the longest HVAC submarine cable in the world at this time installed in one complete length and at this voltage.
Go to pageThe national power grids between Denmark and Norway are connected through four DC-links crossing the Skagerrak strait, capable to carrying 1700 MW of renewable energy to the two countries’ energy mix. One of the cables, the Skagerrak 2, was damaged due to external impact.
Go to pageBreezy southern Gotland was an early favorite for wind power. By the late 1990’s, the Swedish island had an installed wind power capacity of 40 MW (megawatt). To cope with additional wind power generation, the island grid needed an improved way of maintaining power quality.
Go to pageNKT supplies transmission links to, from and between wind farms and national energy grids.
Go to pageSupporting electric transportation with new charging connections for heavy vehicles
Go to pageComplete solution of 320 kV onshore and offshore cables system with a capacity of 1 400 MW.
Go to page