Filter and download specific information by keyword.
Sweden’s second-largest city, Göteborg, needed to strengthen its power grid to replace cables at the end of their lifetime. As part of its upgrade project with NKT at the start of 2020, it upgraded out 94 kilometres of first-generation PEX cables with new NKT cables.
Go to pageEfficient repair of a submarine cable system between Sweden and Germany in just 29 days.
Go to pageNKT completed turnkey cable system project on record time.
Go to pageIn 2011 NKT completed a cable system solution for the Bayonne Energy Center near the New York Harbor, which generates 512 MW of electricity.
Go to pageHolmriis in Ebeltoft has started to use QABLE BOX from NKT in their service vans. This provides for a better overall economy when using cables and wires.
Go to pageWith the introduction of the new electrical safety requirements, it is important to be aware of how to select your cables in the future.
Go to pageAs more and more electrical installers are using 90° C installation cables and have actually done so for many years, NKT introduces an upgrade to our well known NOIKLX® cable.
Go to pageOur cables have an integrated rip cord. This unique solution enables you to strip cables in no time - without injuries to hand or cable.
Go to pageA robust cable with a strong sheath and a small diameter. At the same time, it is a cable that can also be used with great advantage for indoor installations because of its ease of handling and reduced volume.
Go to page