Filter and download specific information by keyword.
30 kV in-field and 150 kV export cables for Germany's first commercial windfarm - 80 km total length
Go to pageUnderground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
Go to pageNu kan du få halogenfri flexrør med ledninger på QADDY®. Fleksible flexrør med ledninger benyttes til både åbne og skjulte installationer. Kan indstøbes i beton.
Go to pageQaddy® is now available with halogen-free flextube wire. Flexible tubes with pre-wired conductors can be used for both open and closed installations and can be embedded in concrete.
Go to pageThe Martin Linge oil and gas field is located in the North Sea offshore Norway, close to the border to the UK continental shelf. The owner Equinor wanted to power the offshore activities from the onshore power grid instead of using onsite generators.
Go to pageNordBalt is a joint project of the Swedish and Lithuanian TSOs (transmission system operators) Svenska kraftnät and Litgrid AB. It is part of Lithuania’s long-term strategy to secure its energy independence by interconnecting the power grids of the Baltic countries with other grids.
Go to pageWith expected resource base of 2.7 billion barrels of oil equivalents, Johan Sverdrup is one of the most important industrial projects in Norway in the next 50 years. Peak production is estimated to be 660,000 barrels of oil per day.
Go to pageThe Nordergründe wind farm, located in the North Sea off the coast of Germany, is part of Energiewende, the German government´s strategy to increase the share of renewable energy in the national energy mix.
Go to pageThe Goliat oil and gas field, 105 km off the Northern coast of Norway, was discovered in 2000 and is operated by Eni Norge. The production of oil and gas from a FPSO (floating, production, storage and offloading) platform started in 2016.
Go to page