Filter and download specific information by keyword.
Turnkey solution including planning, material production, installation and testing for a wind farm in the German North Sea - 51 km total length
Go to pageSuccessfully completed a vital and complex project to improve electrical transmission in the Auckland area.
Go to pageTurnkey project for 380 kV cable system for TenneT TSO - 132 km total length
Go to pageUsing 220 kV submarine and onshore cables cables to connect Glanagow and Raffeen via a busy shipping route - 30.5 km total length
Go to page30 kV in-field and 150 kV export cables for Germany's first commercial windfarm - 80 km total length
Go to pageUnderground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
Go to pageQaddy® is now available with halogen-free flextube wire. Flexible tubes with pre-wired conductors can be used for both open and closed installations and can be embedded in concrete.
Go to pageThe Martin Linge oil and gas field is located in the North Sea offshore Norway, close to the border to the UK continental shelf. The owner Equinor wanted to power the offshore activities from the onshore power grid instead of using onsite generators.
Go to pageNordBalt is a joint project of the Swedish and Lithuanian TSOs (transmission system operators) Svenska kraftnät and Litgrid AB. It is part of Lithuania’s long-term strategy to secure its energy independence by interconnecting the power grids of the Baltic countries with other grids.
Go to page