Filter and download specific information by keyword.
NKT ist ein Hauptlieferant für zwei der Korridorprojekte, die für die Energiewende in Deutschland unverzichtbar sind. SuedOstLink wird die weltweit erste große kommerzielle 525 kV VPE HGÜ 2,0 GW-Verbindungsleitung und SuedLink wird die weltweit längste unterirdische HGÜ-Stromverbindung.
Go to pageNKT cable systems enable high-voltage power transmission between Sweden and Poland and pave the way for new investments in power generation.
Go to pageNKT supports ongoing German energy transition, known as "Energiewende" by delivering a total of almost 300 km of cables with low carbon footprint.
Go to pageNKT contributes to the green transformation of the UK power supply delivering export and array cable systems to Triton Knoll.
Go to pageFra PVC (PVL) til halogenfri (NOVL). Vi udfaser PVL 1,5-2,5 mm², som konverteres til NOVL 70° 1,5-2,5 mm².
Go to pageSweden’s second-largest city, Göteborg, needed to strengthen its power grid to replace cables at the end of their lifetime. As part of its upgrade project with NKT at the start of 2020, it upgraded out 94 kilometres of first-generation PEX cables with new NKT cables.
Go to page